A development of flats and houses on a former bowling green with a mandate to achieve Passivhaus principles, as well as CSH Level 3 to 5 as part of local planning policy requirements.  SRE supported the developer and the contractor in delivering an all-electric scheme which included the use of triple glazing, Porotherm blocks, rain water harvesting and photovoltaics. The scheme achieved a high level of air tightness and thermal resistance whilst maintaining the integrity of the original design for a modern terrace to match the surrounding 19th century housing and flats.

SRE is also undertaking a two year post construction monitoring programme, in which all aspects of building performance are being monitored, analysed and compared to those predicted during the design process as part of a post occupancy evaluation.

Client: Radian Group
Main Contractor: PMC Construction & Development Services
Architect: mh architects

Testimonial:
'I have always been pleased by the service, professionalism and knowledge of the team at SRE. They have assisted Radian on a variety of projects and provide clear, cost-effective advice for our schemes.'
Steve Taylor, Senior Project Manager, Radian Group